Bathroom Remodeling and Renovations Project - Crystal Lake, IL
Project Description: The customer's townhome was 6 years old. The master suite had only one small closet and a large whirlpool that was never used. The customer wanted more closet space and a beautiful bathroom upgrade/renovation.
The Solution: Scholl Construction removed the old shower and turned the space into a second closet. We removed the whirlpool and installed a new shower enclosure in its place. The old vanities were removed and reinstalled. We added a door to separate the toilet from the rest of the bathroom. As you can see from the photos, we installed an exotic granite from Brazil. We built a wood frame around the custom mirrors. The shower enclosure has half-inch thick glass from floor to ceiling. The full glass, tiled ceiling, two seats and dual showerheads allow the shower enclosure to be used by two people as a steam room. We also installed a hand-held shower. All new materials were of the highest quality. This project took 6 weeks.
Project Photos

Custom granite countertop and framed mirror

New door to toilet and vanity two

One shower seat and vanity one

New steam room/shower in place of old whirlpool

Some Before Shots of this Bathroom Renovation Project

Before photo of whirlpool and vanity number one

Before photo of shower and toilet where new closet and separate room for toilet were built.